Design Process

 

01

Floor Plan & Elevations

First, we create a floor plan of the home, showing the layout of each area including the location of walls, windows, doors, and stairs, as well as fixed installations such as bathroom fixtures, storage spaces, and appliances.

Additionally, two-dimensional elevations are created to give an initial sense of the external configuration of the home as well as internal key areas like the kitchen, living space, bedrooms, and bathrooms.  

Duration: 2-4 weeks

 

02

3D Model

The flat plans are brought to life by creating a three-dimensional representation of the house. This makes it possible to visualise and understand exactly how the design will be realised during the construction phase.

The 3D model will also give you a basic sense of the size, layout and textures of the home.

Duration: 3-5 weeks

 

03

Final Render

The final digital render of the home is a detailed depiction of how the architectural design and the interior design will appear when the construction stage is complete.

We create a full video walkthrough of the home which first-person experience of each space. Additionally, a daylight design plan shows how the sunlight affects the interior and exterior of the house at different periods of the day.

Duration: 3-5 weeks

 

Next Step:

Permits & Construction Preparation

Following the completion of the design, we guide clients through the building permit and regulations process, prepare planning documents, and create construction drawings before beginning construction.