Design Process
01
Floor Plan & Elevations
Additionally, two-dimensional elevations are created to give an initial sense of the external configuration of the home as well as internal key areas like the kitchen, living space, bedrooms, and bathrooms.
Duration: 2-4 weeks
02
3D Model
The flat plans are brought to life by creating a three-dimensional representation of the house. This makes it possible to visualise and understand exactly how the design will be realised during the construction phase.
The 3D model will also give you a basic sense of the size, layout and textures of the home.
Duration: 3-5 weeks
03
Final Render
The final digital render of the home is a detailed depiction of how the architectural design and the interior design will appear when the construction stage is complete.
We create a full video walkthrough of the home which first-person experience of each space. Additionally, a daylight design plan shows how the sunlight affects the interior and exterior of the house at different periods of the day.
Duration: 3-5 weeks
Next Step:
Permits & Construction Preparation
Following the completion of the design, we guide clients through the building permit and regulations process, prepare planning documents, and create construction drawings before beginning construction.
See our full range of services here.